This project consisted of a Tenant Finish for a Fitness Center located in Castle Rock, Colorado. The Mechanical Engineering Design and Plumbing Engineering Design was provided by CDL. We contracted long time co-worker and friend, Chad Smith at 3CE for Electrical Engineering.